Wingham Electrical & Fire completed a comprehensive electrical installation in Glasgow for SGN, supporting the organisation’s transition towards more sustainable and efficient transport solutions.
The scope of works included the design, installation and commissioning of a new electrical distribution board, alongside the complete infrastructure required for four double electric vehicle charging units.
The team also installed seven single-head lighting columns and one double-head lighting column. Each unit was integrated with photocell and time clock controls, providing automated, energy-efficient operation tailored to the requirements of the site.
All works were completed in accordance with current industry standards and regulations, with a strong focus on safety, quality and long-term reliability. From containment and cable management through to final terminations, testing and commissioning, every stage of the project was delivered with technical precision and close attention to detail.
Talk to our team about your site, project or property - commercial or residential, across Kent and the South East.